
Date
- Date
- 20th Nov 1986
Time
- Time
- ...

INS Shankush, was commissioned into the IndianNavy.
On 20 November 1986, INS Shankush (S45), a German-built Shishumar-class (Type 209/1500) diesel-electric submarine, was commissioned into the Indian Navy.
Built by Howaldtswerke-Deutsche Werft in Kiel, West Germany, it was the second submarine of its four-vessel class.
Its induction strengthened India's conventional submarine fleet and marked an important milestone in Indo-German naval cooperation.
History of INS Shankush
The history of INS Shankush is closely connected with India's submarine modernisation programme during the late twentieth century.
The Indian Navy began operating submarines in 1967 with the commissioning of INS Kalvari, a Soviet-built Foxtrot-class submarine.
As its maritime security requirements expanded, India sought advanced conventional submarines from international manufacturers.
During the late 1970s and early 1980s, India evaluated several foreign submarine designs.
On 11 December 1981, India reached an agreement with the West German shipbuilding company Howaldtswerke-Deutsche Werft (HDW) for the acquisition of four Type 209/1500 submarines.
Under the agreement, the first two submarines were to be constructed in West Germany, while the remaining two would be built in India with German technological assistance.
This programme became the foundation of the Indian Navy's Shishumar-class submarine fleet.
Construction of INS Shankush
INS Shankush was constructed by Howaldtswerke-Deutsche Werft at its shipyard in Kiel, West Germany.
The submarine was developed under the German Type 209 programme, a family of diesel-electric submarines designed for naval operations.
The Indian variant, designated Type 209/1500, incorporated equipment and design characteristics suited to the Indian Navy's requirements.
The Shishumar class was designed for underwater surveillance, anti-submarine operations, anti-surface warfare and maritime defence.
The construction programme also contributed to the development of India's submarine-building expertise through technology transfer and cooperation with Mazagon Dock.
INS Shankush Commissioning on 20 November 1986
The INS Shankush commissioning took place on 20 November 1986, when the submarine officially entered service with the Indian Navy.
It received the pennant number S45.
INS Shankush became the second submarine of the Shishumar class, following INS Shishumar (S44), which had been commissioned on 22 September 1986.
Both submarines were constructed by HDW in West Germany.
The commissioning of INS Shankush expanded the Indian Navy's fleet of modern diesel-electric submarines and strengthened its underwater operational capabilities.
The induction also represented a significant achievement in Indo-German defence cooperation.
Shishumar-Class Submarines of the Indian Navy
The Shishumar class consists of four submarines acquired through India's cooperation with Germany.
| Submarine | Pennant | Commissioning Date |
|---|---|---|
| INS Shishumar | S44 | 22 September 1986 |
| INS Shankush | S45 | 20 November 1986 |
| INS Shalki | S46 | 7 February 1992 |
| INS Shankul | S47 | 28 May 1994 |
The first two submarines were constructed in West Germany.
INS Shalki and INS Shankul were built by Mazagon Dock in Mumbai under the technology-transfer arrangement.
This programme contributed to the development of India's domestic submarine construction capabilities.
Technical Features of INS Shankush
INS Shankush belongs to the Shishumar class of conventional diesel-electric attack submarines.
The class incorporates several features designed for underwater operations.
Principal Class Specifications
- Submarine Type: Diesel-electric attack submarine.
- Design: German Type 209/1500.
- Length: Approximately 64.4 metres.
- Beam: Approximately 6.5 metres.
- Submerged Displacement: Approximately 1,850 tonnes.
- Submerged Speed: Approximately 22 knots.
- Crew: Approximately 40 personnel.
- Armament: Eight 533 mm torpedo tubes.
- Special Feature: Integrated crew escape sphere.
These figures describe the Shishumar-class design and do not necessarily represent every modification made during subsequent refits.
Integrated Submarine Escape Sphere
An important feature of the Shishumar class is its integrated escape sphere.
Designed to support crew evacuation during an underwater emergency, the system provides an additional means of escape from a disabled submarine.
The sphere was designed to accommodate the submarine's crew, making it a notable safety feature of the class.
Its inclusion distinguished the Indian Type 209/1500 configuration from many other conventional submarine designs.
Operational Role of INS Shankush
INS Shankush was acquired to strengthen India's conventional submarine capabilities.
Diesel-electric attack submarines perform several important naval functions, including:
- Underwater reconnaissance and surveillance.
- Anti-submarine warfare.
- Anti-surface warfare.
- Maritime security operations.
- Sea-denial missions.
- Submarine crew training and operational readiness.
Such submarines support naval deterrence by maintaining the ability to operate underwater and monitor maritime activity.
The induction of INS Shankush strengthened the Indian Navy's capacity to undertake these missions.
INS Shankush Modernisation and Life-Certification Programme
Submarines require periodic maintenance, equipment upgrades and structural inspections to maintain their operational capabilities.
On 30 June 2023, the Indian Ministry of Defence signed a contract with Mazagon Dock Shipbuilders Limited (MDL), Mumbai, for the Medium Refit with Life Certification (MRLC) of INS Shankush.
The contract was valued at ₹2,725 crore.
The programme was intended to modernise the submarine and extend its operational service life.
It also supported the development of domestic submarine maintenance, repair and overhaul capabilities.
At the time of the agreement, the Ministry of Defence scheduled the submarine's post-refit delivery for 2026.
The programme represented another important milestone in the history of INS Shankush, demonstrating continuing efforts to maintain and modernise India's existing conventional submarine fleet.
Historical Significance of INS Shankush
The commissioning of INS-Shankush on 20 November 1986 was significant for several reasons.
First, it marked the induction of India's second Shishumar-class submarine.
Second, the submarine represented the expansion of India's modern German-designed conventional submarine fleet.
Third, the programme strengthened technical and industrial cooperation between India and West Germany.
Fourth, the wider Shishumar-class project contributed to India's development of domestic submarine-building expertise through the construction of INS Shalki and INS Shankul.
Finally, the submarine's subsequent maintenance and modernisation programmes reflected the long-term importance of sustaining underwater naval capabilities.
Conclusion
On 20 November 1986, INS-Shankush (S45), a German-built Shishumar-class diesel-electric submarine, was commissioned into the Indian Navy.
Constructed by Howaldtswerke-Deutsche Werft in Kiel, West Germany, it became the second submarine of its four-vessel class.
Its commissioning marked an important stage in India's conventional submarine modernisation programme and Indo-German naval cooperation.
The induction of INS-Shankush remains a notable event in the history of the Indian Navy and India's underwater defence capabilities.
References
- Bharat Rakshak – Indian Navy: Shishumar Class, Commissioning Dates and Technical Specifications
https://www.bharat-rakshak.com/navy/equipment/submarines/shishumar-class/ - Navypedia – Shishumar Submarines (1986–1994), Construction and Commissioning Records
https://www.navypedia.org/ships/india/in_ss_shishumar.htm - Ministry of Defence, Government of India – Contract for Medium Refit with Life Certification of INS Shankush, 30 June 2023
https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=1936402 - Shephard Media – India to Refit an Ageing Type 209 Submarine, 7 July 2023
https://www.shephardmedia.com/news/naval-warfare/amidst-a-numbers-crisis-india-to-refit-an-ageing-type-209-submarine/ - The Indian Express – History of India's Submarine Acquisition and German Type 209 Programme
https://indianexpress.com/article/explained/scorpene-leak-story-of-indias-submarine-acquisition-explained-2994911/lite/
Also Read : The Prasar Bharati Act came into force in India.

